Unique Solutions for Demanding Applications
The upgrades delivered by GARO are expected to produce a 50% improvement in efficiency at the Nornickel’s facility, with further cost and downtime reduction expected as a result of the technological overhaul.
· Minimized risk of corrosion
· Eliminated metal-on-metal contact
· Customized logic controller to meet special operational turndown requirements
· Innovative design for simplified installation and maintenance