The upgrades delivered by NASH / GARO are expected to produce a 50% improvement in efficiency at the Nornickel’s
facility, with further cost and downtime reduction expected as a result of the
technological overhaul.
·
Minimized risk of corrosion
·
Eliminated metal-on-metal
contact
·
Customized logic controller to
meet special operational turndown requirements
·
Innovative design for
simplified installation and maintenance
Fill out the short form below to download a copy of the case study